Frameworks

BSG have completed the Design and Build Construction of Waste Water Treatment Works , Clean Water Treatment, Clean Water and Foul Water Pump Stations, Gravity and Rising mains, Marine Works, Sea Outfalls, new building works and refurbishment of existing buildings under this contract.

We have also carried out a large number of minor works improvements to existing sewerage treatment plants and pump stations including Mechanical and electrical upgrades. BSG have gained extensive experience in supply chain management and dealing with statutory organisations during this framework. These include Dept of Infrastructure(Roads), Rivers agency, NIE, BT, Gas Networks, PSNI, Crown Estates, Commissioners of Irish Lights, NIEA, and have dealt with the public and public relations. ​

Rural Wastewater Improvement Programme

Value: £34m

The project utilises the RBC process with upfront underground storm tanks sized to deal with 2 hour storm storage capacity. The process units are also designed for 90 day sludge storage volume and uses stainless steel manifold pipework for sludge withdrawal. We have also designed sustainable solutions to include adding reed beds and refurbishment of existing assets to include replacement and cleaning of filter media. Phased construction allowed the new works to be constructed within the existing site boundary.

RBC West and South

Value: £33.4m

​This contract was the construction of 23 Nr WwTWs in the Western and Southern Water Service Divisions. All sites used the Rotating Biological Contactor process for treatment and contained sludge storage and pumping facilities for 30 days, inlet screening for grit and grease removal, storm flow treatment, control buildings and standby generation. In addition, the contract included the upgrade of local sewerage networks. Phased construction often allowed the new works to be constructed within the existing site boundary.

Service Reservoir Programme

Value: €2m

This scheme involved Cleaning, Inspection & minor repair of Service Reservoirs throughout the Midlands and North West– including Counties Donegal, Leitrim, Cavan, Monaghan, Longford, Meath, Westmeath & Laois.

Watermain Rehabilitation Framework

Value: £25m

This major programme of work delivers what matters for our customers by replacing watermains thereby dramatically improving the quality, reliability and security of the water supply, while also reducing leakage. BSG utilise locally employed contractors and suppliers to deliver the project.

The scale of the water mains project has required extensive work on local roads throughout the North of Ireland. However, where possible, the team use state of the art low-dig technology, primarily directional drilling, which means that many of the mains are installed without the need to open large trenches.